Lidia NICULIȚĂ, Laurențiu RECE, Andreea Dora Bianca PIRONEA
​UTCB – Technical University of Civil Engineering of Bucharest Romania, Lacul Tei 122-124, Bucharest, Romania
DOI: https://doi.org/10.31410/eraz.2018.824

4th International Conference – ERAZ 2018 – KNOWLEDGE BASED SUSTAINABLE ECONOMIC DEVELOPMENT, Sofia- Bulgaria, June 7, 2018, CONFERENCE PROCEEDINGS published by: Association of Economists and Managers of the Balkans, Belgrade, Serbia;  Faculty of Business Studies, Mediterranean University – Podgorica, Montenegro; University of National and World Economy – Sofia, Bulgaria; Faculty of Commercial and Business Studies – Celje, Slovenia; Faculty of Applied Management, Economics and Finance – Belgrade, Serbia, ISBN 978-86-80194-12-7

Abstract

This paper refers to construction works that become concealed, as well as to the dangers and risks they generate; it also focuses on the potentially negative consequences of concealed construction works on the quality and safety of buildings. This is a constant, critical issue which requires prevention methods, thorough research for the risks identification and monitoring by all stakeholders directly involved in the construction stages. This article describes and proposes an original method of qualitative and quantitative risk analysis for concealed construction works we define as the estimated probability-impact risk diagram method. 


Key words

Construction quality and safety, risk analysis, concealed works, quality management


References

  1. X X X  – Standard SR ISO 31000:2010, Managementul riscului – Principii si linii directoare.
  2. X X X – Standard SR EN 31000:2010, Managementul riscurilor – Tehnici de evaluare a riscului.
  3. Hopkin, P., Fundamentals of Risk Management, 2nd Edition, Kogan-Page (2012), ISBN:978-0-7494-6539-1.
  4. Ciocoiu, C., N. (2008) Managementul riscului, vol. 1, Teorii, practici, metodologii, Editura ASE.
  5. Ciocoiu, C., N., (2008) Managementul riscului, vol. 2, Modele economic-matematice, Instrumente si tehnici, Editura ASE.
  6. Crouhy, Michel, (2003) Risk Management, New York, McGraw-Hill, 2001.
  7. Lam, James, Enterprise Risk Management: From Incentives to Controls, Hoboken, John Wiley and Sons.
  8. Waters, Donalds, (2007) Supply Chain Risk Management – Vulnerability and Resilience in Logistics, London, Kogan-Page.
  9. Niculita, L., (2013) Nou sistem de management al calitatii pentru siguranta constructiilor cu utilizarea analizei riscurilor si a punctelor critice de control, Calitatea Acces la Succes, Vol. 14, nr.134, pag. 7-15.
  10. Niculiţã, L., (2005) Management and quality engineering, Romanian Academy, Bucharest.
  11. Georgescu, D., Rece, L., Pironea, B., Apostu, A., (2018) Metodologie de evaluare a caracteristicilor de rezistenta ale betonului bazata pe analiza punctelor critice generate de specificul lucrarilor care devin ascunse, Revista Romana de Materiale, Nr. 2.